01/09/2018 by yencerservices 0 Comments
Kingston Project
- Contracted to support installation of blade sensors on three Gamesa Wind turbines
- The sensors were part of a remote system to compensate for strain on the blades caused by wind. They were able to prolong the life of the wind turbine
- Installed the sensors and control systems for the devices. Installed and configured network equipment
Comments